13 Dec 2006 13:31 - zorro
Windpower installation March 07

 

 

 

Air

Tuesday 13th March '07

This is a page for those interested in installing [ ... ]

WindpowerRead more...
18 Nov 2008 18:09 - snipe

Windpower Update November 08

 

So its now November and our turbine has survived some heavy winds [ ... ]

WindpowerRead more...
06 Nov 2009 17:08 - zorro
Windpower november 09

So the turbine has been working well now for over a year and a half, Fitting the smaller blades has really [ ... ]

WindpowerRead more...
04 Dec 2009 12:24 - jimnoctor
Pv solar power

NOVEMBER 09

We have been living and working off grid for three years now, with electricity solely from [ ... ]

Power from the SunRead more...
10 Mar 2011 11:10 - judy
Diary of a week 2007... 4 years later

10th March 2011

 

Four years have flown by, we have become one with the earth and energy here. [ ... ]

Off grid livingRead more...
01 Mar 2012 19:07 - jimnoctor
Rebuilding Charlie

Rebuilding Charlie

Charlie has been providing our power here for the past 5 years , has weathered many [ ... ]

WindpowerRead more...
Digg it!
Share in Facebook
Tweet it!

So the turbine has been working well now for over a year and a half, Fitting the smaller blades has really made a great diffrence as has increasing the strength of everything,

The UPS which we have being using as an inverter is going strong  The only thing about it is it is 300 meters away from the house, and if we wnt to shut it down to save power in calm times we have to travel up there, not so nice on a winters night . So  i have decided to try and control it remotely using rf signal.

 

On inspecting the UPS i see there are two switches, one for on and one for off, both are non latching types, the on swich requires to held in position for about 3 seconds.This is good as it should be fairly easy to parallel these with two relays, one with a timed operation. Out with the soldering iron and after a few hours we have two af activated circuits connected to relays reasy for insertion.

I have also decided to add a LVD circuit to the UPS. A lvd circuit disconnects the UPS when the battery voltage  Falls below a specified level and reconnects it again when the batterys are back to full charge . This is  essential really as it prolongs the battery life. The lvd circuit is built around a PICAXE chip. connected to two timed relays.

image27 This picture shows the Monitoring circuit,board which includes the two switchs, its  a simple job to solder a few wires across the backs of these, care is needed not to damage the ribbon cable.

Next steps Adding some solar panels

And rebuilding charlie turbine 2011 to Hugh Piggots design ..roughly :)